Some systems are under maintenance.

Last updated 3 hours ago
    • Network

      Under maintenance
    • Power

      Operational
    • Cooling

      Operational
    • AS174 - Cogent

      Operational
    • AS1299 - Arelion

      Operational
    • AS2914 - NTT

      Performance issues
    • AS5405 - Inter.Link

      Operational
    • AS5511 - Orange

      Operational
    • AS6453 - TATA

      Operational
    • AS6762 - Telecom Italia Sparkle

      Operational
    • AS9002 - RETN

      Operational
    • AS34549 - Meerfarbig

      Operational
    • Cloud

      Operational
    • DNS

      Operational
    • DDoS-Filter

      Operational
    • E-Mail

      Operational
    • VServer

      Operational
    • VServer - Backups

      Operational
    • Web

      Operational

Status of AS200462

Planned maintenance

  • In progress

    Beschreibung

    Auf dem Edge-Router edge1.ntt-esch.fra1.eth-services.de wird ein Firmware-Update durchgeführt.

    Wartungsfenster: Samstag, 24.10.2026, 22:00 Uhr bis Sonntag, 25.10.2026, 02:00 Uhr (MESZ)

    Auswirkungen

    • VPS-Dienste: Keine Beeinträchtigung zu erwarten.
    • BGP-Sessions auf edge1.ntt-esch.fra1: Während der Arbeiten nicht verfügbar.

    Ablauf

    Vor Beginn des Updates werden sämtliche BGP-Sessions auf dem Gerät kontrolliert heruntergefahren. Dadurch kann der Traffic geordnet auf alternative Pfade umgeleitet werden. Nach Abschluss des Updates und erfolgreicher Funktionsprüfung werden die Sessions wiederhergestellt.

    Eine Aktion auf Kundenseite ist nicht erforderlich.

    Zeitfenster

    Das angegebene Zeitfenster ist als Puffer ausgelegt. Die tatsächliche Unterbrechung der BGP-Sessions wird voraussichtlich kürzer ausfallen.


    Description

    A firmware update will be performed on edge router edge1.ntt-esch.fra1.eth-services.de.

    Maintenance window: Saturday, 24 Oct 2026, 22:00 CEST (20:00 UTC) to Sunday, 25 Oct 2026, 02:00 CEST (00:00 UTC)

    Impact

    • VPS services: No impact expected.
    • BGP sessions on edge1.ntt-esch.fra1: Unavailable during the maintenance.

    Procedure

    Prior to the update, all BGP sessions on the device will be shut down in a controlled manner, allowing traffic to be rerouted to alternative paths in an orderly fashion. Once the update has been completed and verified, the sessions will be re-established.

    No customer action is required.

    Maintenance window

    The stated window serves as a buffer. The actual interruption of BGP sessions is expected to be shorter.

    Affected Components: Network
    40 minutes ago 2026-10-24 20:48 UTC

    During the firmware upgrade, one interface bundle flapped unexpectedly before the sessions had been shut down, causing a brief traffic disruption. The device has since been removed from production traffic, and the maintenance will continue as planned. We apologize for any inconvenience caused.

Past incidents

4 days ago 2026-10-19 22:00 UTC
Fixed
Affected Components: Web

Fixed

11 hours ago 2026-10-24 09:54 UTC

Das Kundenverwaltungsportal und die VPS-Verwaltung sind wieder erreichbar. Damit stehen alle Dienste früher als ursprünglich geplant wieder zur Verfügung. Die Lage wird weiterhin aufmerksam beobachtet. Sollte es erforderlich werden, werden umgehend weitere Maßnahmen ergriffen.

The customer management portal and VPS management are available again. All services are therefore back in operation earlier than originally planned. The situation continues to be closely monitored, and further measures will be taken promptly should they become necessary.

Identified

1 day ago 2026-10-23 19:20 UTC

22 Oct 2026, 12:45 UTC The update of the systems is proceeding as planned. Concerns about the effectiveness of the security release have largely been resolved. A PHP core developer has confirmed an additional vulnerability, but it is unrelated to the previously announced issues and is not rated as critical. Most internal systems and other public services are back in operation. As no vendor patches are available yet for the regular status page, status updates will continue to be published on this page for the time being. The customer management portal and VPS management will remain offline for now while the situation continues to be monitored. A return to normal operation is planned for Sunday, 25 October 2026.

21 Oct 2026, 15:45 UTC There are indications that the published security release may not fully resolve the vulnerabilities. Until the situation has been clarified, all affected systems, including internal services and the customer management portal, will remain out of operation as a precaution. Further updates will be posted here.

21 Oct 2026, 15:00 UTC The update of the affected systems is proceeding as planned. Parts of the internal infrastructure are already back in operation. The security updates for the customer management portal have been applied. It will be released once the outstanding fixes for the underlying backend components are in place.

20 Oct 2026 The PHP-based public services were shut down as a precaution. VPS are not affected.

Reported

4 days ago 2026-10-19 22:00 UTC

The PHP security team has published an unscheduled security release for two critical vulnerabilities, each rated CVSS 9.2. Read the announcement

To protect customer data, the PHP-based public services have been proactively shut down until the patches have been applied and verified. The VPS themselves are not affected and remain online. Only the VPS management interface is temporarily unavailable. Services will then be restored step by step. No definite time can be given at this point.

Appropriate action on customer-managed VPS systems is recommended as well.

In case of emergency: support@eth-services.de

5 months ago 2026-05-21 21:26 UTC
Fixed

Fixed

5 months ago 2026-05-21 21:26 UTC

We are currently observing an LACP flap due to a configuration change, which should not have reset the link, causing BGP flaps toward various carriers. The situation is already recovering. We apologize for the inconvenience.

5 months ago 2026-05-21 19:54 UTC
Fixed

Fixed

5 months ago 2026-05-23 15:39 UTC

The situation has been confirmed stable from Sparkle NOC and bgp has been reestablished. While RFO is pending, we consider the situation fully resolved.

Investigating

5 months ago 2026-05-22 21:55 UTC

As per latest update no issues could be found on transport layer from Sparkles transport team. Further investigation are ongoing with JTAC. No ETR is available at the time but no customer impact is observed.

Identified

5 months ago 2026-05-21 21:38 UTC

As per the latest update, Sparkle confirmed the issue was due to flaps on transport within FRA metro-ring. Coordination with the transport team is ongoing. Sparkle remains drained until the situation is resolved.

Reported

5 months ago 2026-05-21 19:54 UTC

We are currently observing constant route propagation flaps via Sparkle. Traffic has been shifted to other carriers, and a ticket has been opened. We are currently awaiting a response from the Sparkle NOC.